Tip Changing Procedure (Teaching)
Details Torque Chart Points of Attention| Frequency: | As Needed |
|---|---|
| Execution Time: | 5 Minutes |
| Machine Status: | Static |
| Activity Type: | Mechanical |
| Bolt Size | N.M.S.S. "70" | Socket/Hex Class 12.9 | ||
|---|---|---|---|---|
| M12 - 1.75 | 117 Nm | 86 ft/lbs | 135 Nm | 100 ft/lbs |
| M10 - 1.5 | 50 Nm | 37 ft/lbs | 77 Nm | 57 ft/lbs |
| M8 - 1.25 | 30 Nm | 22 ft/lbs | 39 Nm | 29 ft/lbs |
| M6 - 1.0 | 14 Nm | 10 ft/lbs | 16 Nm | 12 ft/lbs |
| Fulcrum Nut | not applicable | 30 Nm | 22 ft/lbs | |
| Soft Joint Breakaway Specifications (Shunt Lug) | ||||
| M8 - 1.25 | 18 Nm | 13 ft/lbs | not applicable | |
- Torque Wrench for Slotted Nut
- Pin Spanner Wrench
- Slotted Nut Wrench
Make sure you are wearing proper PPE before beginning this maintenance activity. Refer to plant and department specific PPE requirements.
Lockout all stored energy sources in the work area using proper procedure. Review lockout placard and follow plant lockout procedures.
If you are unclear how to preform this task, ask your supervisor.
While performing this PM, if you discover any problems that are outside the scope of the work covered by this PM, generate a work ticket to initiate the necessary repairs AND report to your supervisor.
If this PM is not accurate please document any changes or additions that should be made and give them to your supervisor.
